We are proud to share with you our projects adding value currently to our country and investors performed together with our solution partners with the references of our company. We continue with you "to produce with unending energy".
Gürgen HES (TURKEY)
Location: Rize · Capacity: 2.43 Mw
Derebaşı HES (TURKEY)
Location: Trabzon · Capacity: 11.32 Mw
Keserali HES (TURKEY)
Location: Muğla · Capacity: 1.25 Mw
Gökböğet HES (TURKEY)
Location: Isparta · Capacity: 3.18 Mw
Balıklı HES (TURKEY)
Location: Artvin · Capacity: 10.55 Mw
Turunçova HES (TURKEY)
Location: Antalya · Capacity: 4 Mw
Karaca HES (TURKEY)
Location: Giresun · Capacity: 3.12 Mw
Kardelen HES (TURKEY)
Location: Ordu · Capacity: 4.51 Mw
Yumurtepe HES (TURKEY)
Location: Giresun · Capacity: 4 Mw
Kalecik HES (TURKEY)
Location: Artvin · Capacity: 5 Mw
Araklı HES (TURKEY)
Location: Trabzon · Capacity: 9.18 Mw
Derecik HES (TURKEY)
Location: Artvin · Capacity: 2.81 Mw
Çökek HES (TURKEY)
Location: Muğla · Capacity: 10.5 Mw
Kocaman HES (TURKEY)
Location: Artvin · Capacity: 3.32 Mw
Rüzgarli HES (TURKEY)
Location: Rize · Capacity: 9.93 Mw
Sifon HES (TURKEY)
Location: Gümüşhane · Capacity: 2.80 Mw
Polatlı GES (TURKEY)
Location: Ankara · Capacity: 8 Mw
Sungurlu GES (TURKEY)
Location: Çorum · Capacity: 6 Mw
Kurşunlu GES (TURKEY)
Location: Çankırı · Capacity: 7 Mw
Çifteler GES (TURKEY)
Location: Eskişehir · Capacity: 6 Mw
Sivrihisar GES (TURKEY)
Location: Eskişehir · Capacity: 6 Mw
Sincan Biogaz (TURKEY)
Location: Ankara · Capacity: 3 Mw
De Solar 7 Biogas Power Plant installed in Anayurt Neighborhood of Sincan District of Ankara Province with mechanical power 3,285 MWm electrical power 3,201 MWe is supported by YEKDEM and its provisional acceptance has been made. It facilitates the stages of collection of waste and conveyance to the plant to be processed that the plant is located in the organized livestock zone. In the plant, as a result of processing by anaerobic decomposition technology, biogas, energy and fertilizer production shall be performed. Usable biogas shall be obtained from organic waste and electricity and heat production shall be maintained through gas motors (cogeneration). In the plant processed fermented solid-state and liquid product generating besides electricity production shall be considered as organic fertilizer.
Hamzabeyli RES (TURKEY)
Location: Edirne · Capacity: 6 Mw
BagratiWF (GEORGIA)
Location: Imereti · Capacity: 111 Mw
ChobalauriWF (GEORGIA)
Location: ShidaKartli · Capacity: 96 Mw
KaspiWF (GEORGIA)
Location: ShidaKartli · Capacity: 36 Mw
GomiWF (GEORGIA)
Location: ShidaKartli · Capacity: 15 Mw
KvakhvreliWF (GEORGIA)
Location: ShidaKartli · Capacity: 75 Mw
MartkopiWF (GEORGIA)
Location: ShidaKartli · Capacity: 60 Mw
MetekhiWF (GEORGIA)
Location: ShidaKartli · Capacity: 57 Mw
SasiretiWF (GEORGIA)
Location: ShidaKartli · Capacity: 18 Mw
IdletiWF (GEORGIA)
Location: ShidaKartli · Capacity: 39 Mw
Pirveliwind1 (GEORGIA)
Location: Kvemo Kartli · Capacity: 30 Mw
Pirveliwind2 (GEORGIA)
Location: ShidaKartli · Capacity: 110 Mw
PortiWF (GEORGIA)
Location: Samegrelo Zemosvneti · Capacity: 117 Mw
SaakadzeeWF (GEORGIA)
Location: ShidaKartli · Capacity: 15 Mw
VarketiliWF (GEORGIA)
Location: ShidaKartli · Capacity: 153 Mw
ZemoWF (GEORGIA)
Location: ShidaKartli · Capacity: 11 Mw